Your Intelligent Energy Solutions Partner.

Solar PV & Hybrid Energy Systems

Solar delivers most when it is matched to demand and to what the network can accept.

Solar is now one of the cheapest sources of new electricity today, but cheap generation is only useful if it can be used or exported. Our focus is the system around the panels: demand, storage, and the network.

Why it matters

Large volumes of solar change the shape of the daily load on the grid. Pairing it with storage and flexible demand turns a midday surplus into evening supply, which is central to a sustainable and affordable system.

Where we focus

  • Generation and yield assessment for roof and ground mounted sites
  • Self-consumption and demand matching from site load data
  • Hybrid designs combining solar PV, storage and EV charging
  • Export and import limits and what they mean for system size
  • The connection route likely to apply, including G98 and G99

Questions we explore

  • How much of what a site generates can it use itself?
  • When does adding storage change the case for solar?
  • How do export limits reshape good design?

Common questions

Does solar PV need DNO approval?

Generation connected to the distribution network normally needs DNO notification or approval, under G98 for the smallest units and G99 for larger ones. The right route depends on size and location.

Is a battery worth adding to a solar site?

It depends on the demand profile, export limits and tariffs. Modelling the site with and without storage answers it with evidence rather than a rule of thumb.

Questions, ideas or a collaboration in mind?

We are glad to hear from asset owners, engineers, researchers, partners and anyone working on the energy transition.